+86-15817275200
Company News&Blog
Your current location:Home - Blog&News - Company News&Blog
A:Start with the
connector interface—pin count, current rating, and mating half—then add cable
details: conductor size, run length, routing path, and operating environment.
Note the batch quantity and drawing revision. Sending these details in the
first message gives a supplier enough to review the project and return a quote
or a focused list of open items.
A:Send the connector
drawing, pin assignments, mating half, cable length and routing, and finishing
details such as boots, labels, and strain relief. Mark which items are fixed
and which are still open. For a 2+6 pin battery connector, confirm the power
tier—100A or 200A—and how the six signal lines are used. A clear revision
number keeps the connector side and cable side in sync.
A:A battery connector
supplier that handles both can review the interface and harness as one project,
reducing the risk of a mismatch between the connector body and the cable build.
For the DM80, start with the published 2+6 pin, 100A/200A, thermoplastic,
UL94V-0, battery pack facts and ask Ximeconn M12 Connectors to confirm custom
cable assembly scope during drawing review. Wire gauge, termination method,
sample policy, MOQ, and lead time also require drawing review and supplier confirmation.
Workmanship Standard for Crimping, Interconnecting Cables,
Harnesses, and Wiring
Prev: Reviewing Drawing, Sample, and Batch Questions With the Supplier
Next: No data